AirLife Secure™
| Item | Description | Use | Compatibility | Length | QTY |
|---|---|---|---|---|---|
| 2090100V | Leadwire, V-Lead, Grabbers, AHA, Disposable | Disposable | 3.6 m /12 ft | 10 | |
| 2090100-061 | Cable, ECG, Mindray, 3/5-lead, AHA | Reusable | Mindray | 20 cm / 9 in | 1 |
| 2090100-065 | Cable, ECG, Mindray, 12-lead, AHA | Reusable | Mindray | 20 cm / 9 in | 1 |
| 2052133-405 | Leadwire, 3-Lead, Grabbers, AHA | Disposable | Universal | 3.6 m /12 ft | 10 |
| 2052104-405 | Leadwire, 3-Lead, Snaps, AHA | Disposable | Universal | 3.6 m /12 ft | 10 |
| 2052133-406 | Leadwire, 5-Lead, Grabbers, AHA | Disposable | Universal | 3.6 m /12 ft | 10 |
| 2052104-406 | Leadwire, 5-Lead, Snaps, AHA | Disposable | Universal | 3.6 m /12 ft | 10 |
| 2086367-006 | Leadwire, 6-Lead, Grabbers, AHA | Disposable | Universal | 3.6 m /12 ft | 10 |
| 2086349-006 | Leadwire, 6-Lead, Snaps, AHA | Disposable | Universal | 3.6 m /12 ft | 10 |
| 2052133-408 | Leadwire, V-Lead, Grabbers, AHA | Disposable | Universal | 3.6 m /12 ft | 10 |
| 2052104-408 | Leadwire, V-Lead, Snaps, AHA | Disposable | Universal | 3.6 m /12 ft | 10 |














